|
- 17.07.2009 — new «NFM technologies» tunnelling machine was bought.
- 29.12.2008 — "Pobeda prospect" station was opened!
- 12.05.2008 — start of the construction of the second tunnel between "Kozia sloboda" and "Kremlin" stations.
- New plans of development are available.
- "Pobeda prospect" station will open at 30.08.2008.
- 9.03.2008 The first tunnel between "Kozia sloboda" and "Kremlin" stations is ready.
- 23.03.2007 — the second (right) tunnel between "Gorky" and "Pobeda prospect" is ready!
- 17.03.2007 - 10 years of "Kazmetrostroy"! Construction of the Kazan metro began 10 years ago
- Announcements are done in Russian and Tatar.
|
|